求翻译:This is a common problem in construction, at the same time it has a great impact on the cost. First it will directly cause the increase of construction cost, such as: purchase of raw materials, labor cost, machinery price, second funds are not available will result in schedule delays and then result in increasing the c是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This is a common problem in construction, at the same time it has a great impact on the cost. First it will directly cause the increase of construction cost, such as: purchase of raw materials, labor cost, machinery price, second funds are not available will result in schedule delays and then result in increasing the c
问题补充:

  • 匿名
2013-05-23 12:21:38
这是一个建设中的常见问题,同时它具有成本上的巨大影响。首先,它会直接导致建筑成本的增加,如:第二资金购买原材料,劳动力成本,机械价格,是不是可以将导致工期延误,然后导致增加项目的成本,如管理成本,起重机等工程机械的成本,租金成本流材料和其他费用。最后,为项目分配不及时,可能会导致事件无法实现,可导致节省成本。我们可以看到,资金在项目成本管理的生命线。但我们也应该看到建筑公司,这是不可控的。因此,为了避免这种情况,项目业主与施工单位合同前,应检查防范所有者的实力和信誉。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
这是一个常见的问题,在施工,同时它在成本上有很大的影响。首先,它将直接导致增加建筑成本,如: 购买原材料、 劳动力成本、 机械价格第二
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭