当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:水利枢纽工程通常是水利工程体系中最重要的组成部分,水利枢纽按承担任务的不同,可分为防洪枢纽、灌溉(或供水)枢纽、水力发电枢纽和航运枢纽等。多数水利枢纽承担多项任务,称为综合性水利枢纽。水利工程就是水的利用与水害防止的工程,包括灌溉、防洪、排泄、蓄洪、航运等。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
水利枢纽工程通常是水利工程体系中最重要的组成部分,水利枢纽按承担任务的不同,可分为防洪枢纽、灌溉(或供水)枢纽、水力发电枢纽和航运枢纽等。多数水利枢纽承担多项任务,称为综合性水利枢纽。水利工程就是水的利用与水害防止的工程,包括灌溉、防洪、排泄、蓄洪、航运等。
问题补充:

  • 匿名
2013-05-23 12:21:38
Water control project is usually the most important part of the water conservancy system, water control can be divided into different take on the role, the hub of flood control, irrigation (or water) hub, hydropower hub and shipping hub. Most of the water control assume a number of tasks, known as i
  • 匿名
2013-05-23 12:23:18
shapotou hydraulic engineering systems is usually the most important element in the Yangtze River, the different tasks, and can be divided into flood control hub, irrigation (or water) hub, hydropower hub and shipping hub, and so on. Most water bear more than one task, which is called integrated Yan
  • 匿名
2013-05-23 12:24:58
The hydro-junction project usually is in the hydraulic engineering system the most important constituent, the hydro-junction according to undertakes the duty difference, may divide into the flood prevention key position, the irrigation (or water supply) the key position, the hydraulic electrogenerat
  • 匿名
2013-05-23 12:26:38
Project is often the most important part of the water system, water by taking a different, can be divided into hubs for flood control, irrigation (or water) hub hub and shipping hub, hydropower. Most of the project take on multiple tasks, known as the integrated project. Hydraulic engineering is the
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭