当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:先将工件夹紧并加压,然后通电使接触面温度达到塑性温度(950~1000℃)。在压力下塑变和再结晶形成固态焊接接头。电阻对焊要求对接处焊前严格清理,所焊截面积较小,一般用于钢筋的对接焊。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
先将工件夹紧并加压,然后通电使接触面温度达到塑性温度(950~1000℃)。在压力下塑变和再结晶形成固态焊接接头。电阻对焊要求对接处焊前严格清理,所焊截面积较小,一般用于钢筋的对接焊。
问题补充:

  • 匿名
2013-05-23 12:21:38
The first workpiece clamping and pressure, then the power to make contact with the surface temperature reaches the plastic temperature (950 ~ 1000 ° C). The formation of solid-state welded joints of plastic deformation and recrystallization under pressure. Resistance butt welding requires strict cle
  • 匿名
2013-05-23 12:23:18
To clamp the workpiece and under pressure, and then power on the surface temperature reaches 950 plastic temperature ( ~ 1000 °C). Under pressure, and then plastic crystals form solid solder joints. Resistance welding required for the solder up front, and the solder CSA is small, generally used for
  • 匿名
2013-05-23 12:24:58
Clamps first the work piece and pressurizes, then the circular telegram enables the contact face temperature to achieve the plastic temperature (950~1000℃).The plastic deformation and the recrystallization form the solid state weld joint under the pressure.Front upset butt welding request docking pl
  • 匿名
2013-05-23 12:26:38
Clamping and pressure first, then power on contact surface temperature reaches the plastic temperature (950~1000℃). Under pressure welded joint of plastic deformation and recrystallization to form solid. Butt resistance welding requirements strict cleaning before welding, welding and smaller cross-s
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭