当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:设备或机器的临时通电需要测试、调整或设置机器时可能要通电,如果在测试,调整或设置后不需要再通电的,设备应再锁定和标记。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
设备或机器的临时通电需要测试、调整或设置机器时可能要通电,如果在测试,调整或设置后不需要再通电的,设备应再锁定和标记。
问题补充:

  • 匿名
2013-05-23 12:21:38
Temporary power equipment or machinery need to be tested, adjusted or set up your machine may be energized, if the testing, tuning or settings do not need electricity, the equipment should be locked and marked.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Possibly the equipment or the machine temporary circular telegram needs to test, the adjustment or establishes when the machine must electrify, if is testing, after the adjustment or the establishment does not need again to electrify, the equipment should again lock and the mark.
  • 匿名
2013-05-23 12:26:38
Temporary power needs of the equipment or machine testing, adjusting, or set the machine it is possible to power up, if in testing, adjustment or settings do not need to power up, the device should be locked and tagged.
  • 匿名
2013-05-23 12:28:18
Interim power needs testing, adjusting of equipment or machines or might set the camera power, if testing, adjust or set no more power after, device lock and tag.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭