当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本项目环境影响评价的工作重点是建设项目段的长江水的影响评价,建设项目段的长江下游有两处水厂取水口。这两处取水口都在建设项目下游2km以下,对拟建项目下游1km出的水质进行了预测,得出该处水质达到国家和地方的相关规定。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本项目环境影响评价的工作重点是建设项目段的长江水的影响评价,建设项目段的长江下游有两处水厂取水口。这两处取水口都在建设项目下游2km以下,对拟建项目下游1km出的水质进行了预测,得出该处水质达到国家和地方的相关规定。
问题补充:

  • 匿名
2013-05-23 12:21:38
The focus of the work of the project environmental impact assessment is the evaluation of the impact of the construction project of the Yangtze River, the lower reaches of the Yangtze River on the construction project there are two water intake. These two water intake in construction projects downst
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
This project environmental effect appraisal work key point is the items of basic construction section Yangtze River water influence appraisal, the items of basic construction section Yangtze River downstream has two water works intakes.Below these two intake all items of basic construction downstrea
  • 匿名
2013-05-23 12:26:38
Environmental impact assessment of the project's work focuses on impact assessment of construction project of the Yangtze River water, construction projects there are two water plants in the lower reaches of the Yangtze River water intake. Both 2km in the lower intake in the construction project, th
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭