当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Hybrid GAX-PCS, have the same essential elements of a single effect water–ammonia cooling absorption cycle. The rectifier is placed at the top of the generator, to makeanintegrated generator–rectifier(GE–RE) column. TheGAXsection of the generator is placed in the top of theabsorberin order to integrate the absorb是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Hybrid GAX-PCS, have the same essential elements of a single effect water–ammonia cooling absorption cycle. The rectifier is placed at the top of the generator, to makeanintegrated generator–rectifier(GE–RE) column. TheGAXsection of the generator is placed in the top of theabsorberin order to integrate the absorb
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
gax,混合的pc,都有相同的基本元素的单一影响水的氨冷却吸收周期。 整流器置于其顶部的发生器,发生器makeanintegrated整流器(ge-re)列中。 thegaxsection发生器放在顶部的theabsorberin以便把减震器-gax(abgax)列infig如图所示。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
混合 GAX PC,有相同的基本元素的吸收循环冷却的单个效果 water–ammonia。整流发电机,到 makeanintegrated generator–rectifier(GE–RE) 列的顶部放置。生成器 TheGAXsection 放在集成减振器 GAX (ABGAX) 列中,为所显示的 inFig theabsorberin 顺序的顶部。2.Both,GE–RE andAB GAXcolumns higherenergyintegration,获取重要减少 intheheat 供应发电机的各节中分隔和减少 intheheat 也
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭