当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对于钻注过程中出现诸如卡钻、塌孔、埋钻、断钻杆、丢钻头、大量跑浆等情况是否已做了妥善处理,是否达到结束注浆要求,如果未达到,要补加措施,使所有注浆孔的注浆质量达到结束标准。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对于钻注过程中出现诸如卡钻、塌孔、埋钻、断钻杆、丢钻头、大量跑浆等情况是否已做了妥善处理,是否达到结束注浆要求,如果未达到,要补加措施,使所有注浆孔的注浆质量达到结束标准。
问题补充:

  • 匿名
2013-05-23 12:21:38
For drilling injection process, such as sticking and hole collapse, buried drill off the drill pipe, lost drill bit, a lot of running pulp, etc. has been done properly handled, whether the end of the grouting requirements, if not reached, additional measures , so that the quality of the grouting of
  • 匿名
2013-05-23 12:23:18
In the course notes for drilling the holes, hitters such as card hole drilling, buried, thrown into the drill rod, drill bits, such as syrups ran a lot whether it is done properly, the end is reached, if you request Note pulp is not reached, to supplement the measures so that all note pulp slurry in
  • 匿名
2013-05-23 12:24:58
Regarding drills in the note process to appear such as jams, collapses the hole, buries thick liquid situations and so on drills, breaks the drill rod, throws the drill bit, runs massively whether has done has processed properly, whether meets the conclusion note thick liquid requirements, if had no
  • 匿名
2013-05-23 12:26:38
Such as drilling, in the process of drilling and Grouting hole collapse, submerged broken drills, drill pipe, drill bits, lost a lot of run pulp has been done properly, whether to achieve the end of grout requires, if not met, additional measures, that all grout hole Grouting over quality standards.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭