当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:注浆装置安装在孔口的小阀门上,关闭泄浆阀,打开进浆阀,连接注浆泵或混合器的高压软管,进行压水试验。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
注浆装置安装在孔口的小阀门上,关闭泄浆阀,打开进浆阀,连接注浆泵或混合器的高压软管,进行压水试验。
问题补充:

  • 匿名
2013-05-23 12:21:38
Grouting device installed in the orifice valve, close the vent slurry valve, open the valve of the slurry into the high-pressure hose to connect the injection pump or mixer, water pressure test.
  • 匿名
2013-05-23 12:23:18
Note jelly unit installed in the small holes on the valve, turn off the valve to open to pulp slurry injection valve, connect a high-pressure pump or mixer, pressure water hose.
  • 匿名
2013-05-23 12:24:58
The note thick liquid installment installs on the manhole small valve, the closure releases the thick liquid valve, turns on the admission valve, the connection note thick liquid pump or the mixer high-pressured hose, carries on presses the water test.
  • 匿名
2013-05-23 12:26:38
Grouting equipment installed in a orifice on a small valve, close the discharge slurry valve, open admission valve, connect grout mixer pump or hose, water pressure test.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭