当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:THSR construction began in March 2000, and on January 5, 2007, the high-speed railway became operational. The total distance of THSR is 345 km, running from Taipei to Kaohsiung (Tsoying Station). THSR connects to 14 major cities and counties and 77 townships and regions. Twelve stations were originally planned to be bu是什么意思?

待解决 悬赏分:1 - 离问题结束还有
THSR construction began in March 2000, and on January 5, 2007, the high-speed railway became operational. The total distance of THSR is 345 km, running from Taipei to Kaohsiung (Tsoying Station). THSR connects to 14 major cities and counties and 77 townships and regions. Twelve stations were originally planned to be bu
问题补充:

  • 匿名
2013-05-23 12:21:38
高铁的建设开始于2000年3月和2007年1月5日,高速铁路开始运作。高铁的总距离为345公里,从台北到高雄(左营站)运行。高铁连接到14个主要城市,县和77个乡镇和地区。原定12站沿线建。在目前的阶段,八,panciao台北,桃园,新竹,台中,嘉义,台南,左营站已完成,目前在操作(见图1)。其他四个站(南港,苗栗,彰化,云林站)将在稍后阶段建成。
  • 匿名
2013-05-23 12:23:18
台湾高铁建设始于2000年3月,和2007年1月5日、高速铁路已开始运作。 流线的总距离为345公里,运行从台北到高雄(吹吹打打站)。 台湾高铁连接到14个城市,县镇区和区域和77。 12个站原计划是要建立在对齐。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
高铁建设始于 2000 年 3 月和 2007 年 1 月 5 日上, 高速铁路开始运作。高铁总距离 345 公里,从台北到高雄 (左营站) 中运行。高铁连接到 14 个主要城市和县和 77 个乡镇和地区。十二站本来计划建成沿对齐方式。在目前阶段,八个站在台北、 Panciao、 桃园、 新竹、 台中、 嘉义、 台南
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭