当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在详细设计中,对已确定的方案进行设计,将初步设计更具体化,同时,还要设计沥青混泥土路面和普通混凝土路面两种路面结构,此外,还对给排水管道设施,电力,照明设施以及交通标志等进行了设计。经技术指标以及经济指标分析,该设计立论正确、设计合格。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在详细设计中,对已确定的方案进行设计,将初步设计更具体化,同时,还要设计沥青混泥土路面和普通混凝土路面两种路面结构,此外,还对给排水管道设施,电力,照明设施以及交通标志等进行了设计。经技术指标以及经济指标分析,该设计立论正确、设计合格。
问题补充:

  • 匿名
2013-05-23 12:21:38
Programs have been identified in the detailed design, design, preliminary design of more specific, but also the design of asphalt concrete pavement and the two kinds of ordinary concrete pavement pavement structure, also to the sewer facilities, electricity, lighting facilities and traffic signs hav
  • 匿名
2013-05-23 12:23:18
In the detailed design, the design will be more concrete, preliminary design, it is necessary to design asphalt concrete pavement and concrete road surface structure, and both are also on to the sewer facilities, electricity, lighting, as well as traffic signs, such as the design. The specification
  • 匿名
2013-05-23 12:24:58
In the detailed design, to the plan which determined has carried on the design, preliminary design concrete application, simultaneously, but also must design the asphalt concrete road surface and the ordinary coagulation earthen road pavement two kind of pavement structures, in addition, but also to
  • 匿名
2013-05-23 12:26:38
In the detailed design, to design the programmes that have been identified, initial design of more specific, and also design of asphalt concrete pavement and concrete pavement structure of two kinds of road surface and, in addition, also on water supply and sewerage pipelines, auxiliary facilities,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭