当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:支座间长轴方向的净跨110m,短轴方向的净跨80m(Fig.1(b)),支座外围悬挑部分通过V型斜杆与相应标高的混凝土圈梁侧边相连是什么意思?

待解决 悬赏分:1 - 离问题结束还有
支座间长轴方向的净跨110m,短轴方向的净跨80m(Fig.1(b)),支座外围悬挑部分通过V型斜杆与相应标高的混凝土圈梁侧边相连
问题补充:

  • 匿名
2013-05-23 12:21:38
Clear span of 110m, the long axis of the bearing and the short axis direction of the net cross-80m (fig.1 (b)), the cantilevered portion of the bearing peripheral connected to the diagonals v and the corresponding elevation of the concrete ring beam side
  • 匿名
2013-05-23 12:23:18
The long-axis of the inter-net 110 m across, and short-axis 80 of the M-Net (Fig1 (b), the peripheral hanging out in part by V slash and the corresponding pointer on the side of the concrete 圈梁 connected
  • 匿名
2013-05-23 12:24:58
Between the support the major axis direction only cross 110m, the minor axis direction only cross 80m(Fig.1(b)), the support periphery hangs selects the part to pass V strut and the corresponding elevation concrete grid side is connected
  • 匿名
2013-05-23 12:26:38
Bearing between the long axis of the net 110m, net short axis of the cross-80m (Fig.1 (b)), supports external cantilevered parts by v-slash and the corresponding elevation of concrete ring beams connected to the side
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭