求翻译:As a result of the increasing number and complexity of the technical and nontechnical issues that must be addressed by its construction engineers, Granite Construction has put in place a formal process to generate work plans for its field operations. For any project, the process begins with the definition of the operat是什么意思?

待解决 悬赏分:1 - 离问题结束还有
As a result of the increasing number and complexity of the technical and nontechnical issues that must be addressed by its construction engineers, Granite Construction has put in place a formal process to generate work plans for its field operations. For any project, the process begins with the definition of the operat
问题补充:

  • 匿名
2013-05-23 12:21:38
作为结果的数量不断增加和解决的问题,必须由它的建筑工程师的技术和非技术的复杂性,花岗岩施工已设立一个正式的过程,产生野外作业的工作计划。任何项目的过程中开始定义的业务或活动,需要的工作计划。最终产品是一个文件或工作计划,提供所有必要的信息来执行。
  • 匿名
2013-05-23 12:23:18
由于越来越多的技术和非技术的复杂性和问题的,这一问题必须得到解决的建筑工程师、花岗岩建造它提出了一项正式的流程来生成工作计划它的外地业务。 对任何项目来说,这一过程开始的定义,这些行动或活动,这些活动需要一个工作计划。 最终的产品是一个文档或工作计划,提供了所有必要的信息以执行。
  • 匿名
2013-05-23 12:24:58
由于必须由它的建筑工程师论及技术和非技术性的问题的增长的数量和复杂,花岗岩建筑放在适当的位置一个正式过程引起工作计划为它的室外操作。 为所有项目,过程从要求一个工作计划操作或活动的定义开始。 最后产物是提供所有信息必要执行的文件或工作计划。
  • 匿名
2013-05-23 12:26:38
花岗岩建造的日益增多和必须由其建筑工程师的技术和非技术问题的复杂性,已到位为其生成外地业务工作计划的正式流程。用于任何项目,在过程开始定义的操作或所需要的工作计划的活动。最终产品是一个文档或工作的计划,提供执行所需的所有信息。
  • 匿名
2013-05-23 12:28:18
由于必须被其建造工程师处理的技术和非技术问题的与日俱增的数字和复杂性,花岗石建造放进了生成工作的一个正式过程为其作计划的地方其现场的操作。对任何项目,过程以需要一个工作计划的操作或活动的定义开始。最终产品是一份文件或操纵提供所有信息的计划有必要表演。
 
 