当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:根据日计划图,利用非号码制统计方法得出货车在站停留时间统计表,并计算出相应的作业指标。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据日计划图,利用非号码制统计方法得出货车在站停留时间统计表,并计算出相应的作业指标。
问题补充:

  • 匿名
2013-05-23 12:21:38
According to the Japanese plans for the use of non-number system of statistical methods to draw the trucks at the station dwell time tables, and calculate the corresponding operating indicators.
  • 匿名
2013-05-23 12:23:18
In accordance with plans on the use of non-number system, statistical methods in station wagon that dwell time tables, and calculated the job specification.
  • 匿名
2013-05-23 12:24:58
According to the date planning chart, uses the non-number system statistical method to obtain the freight vehicle in the station resident time statistical table, and calculates the corresponding work target.
  • 匿名
2013-05-23 12:26:38
Under the Japanese scheme, using non-number-statistical methods came to the goods station dwell time tables, and calculate the corresponding job indicator.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭