当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:分段检验依据本厂现有质量检验标准,质检部在钢材到货后三周内制定相应检验计划(含单个分段报验),并发布于项目部所有成员及相关部门、同事。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
分段检验依据本厂现有质量检验标准,质检部在钢材到货后三周内制定相应检验计划(含单个分段报验),并发布于项目部所有成员及相关部门、同事。
问题补充:

  • 匿名
2013-05-23 12:21:38
Sub-factory quality inspection standard test basis, QC in the steel after the arrival three weeks to develop appropriate test plans (including a single segment for inspection), and published in all members of the Project Department and related departments, colleagues.
  • 匿名
2013-05-23 12:23:18
This sub-paragraph testing based on an existing plant quality standards, quality inspection department upon arrival in steel within 3 weeks for the inspection program (with a single sub-paragraph) reported that, and to issue all of the members of the project and the relevant departments, and colleag
  • 匿名
2013-05-23 12:24:58
The partition examination rests on this factory existing performance test standard, the quality testing department receipts in the latter three weeks in the steel products to formulate the corresponding examination plan (to declare for examination including single partition), and issues in project d
  • 匿名
2013-05-23 12:26:38
Segment examination according to the existing standards for quality inspection, quality control Department within three weeks of the arrival of steel develop test plan (containing a single section inspection), and was released on all members of the Department and related departments, colleagues.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭