当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施工区域移交后,CCTV监控探头均由工程部拆除保管。5月28日施工现场检查发现,部分CCTV视频、电源线被剪断。(是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工区域移交后,CCTV监控探头均由工程部拆除保管。5月28日施工现场检查发现,部分CCTV视频、电源线被剪断。(
问题补充:

  • 匿名
2013-05-23 12:21:38
Cctv monitoring probes by the Engineering Department to dismantle the construction area after the transfer of custody. May 28, the construction site inspection found that part of cctv video, power cord was cut. (
  • 匿名
2013-05-23 12:23:18
After the transfer, construction area CCTV monitoring probes are removed by the Engineering Department. On 28 May, construction site inspection revealed that some CCTV video, power cord has been cut. (
  • 匿名
2013-05-23 12:24:58
After the construction region turns over, the CCTV monitoring probe head demolishes the storage by the engineering dept.On May 28 the job location inspection discovery, the part CCTV video frequency, the power line are sheared.(
  • 匿名
2013-05-23 12:26:38
Construction area after the handover, CCTV monitoring probes are kept by the Works Department removed. May 28 inspection found at construction site, part of the CCTV video, power supply lines were cut. (
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭