当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The construction of a new energy from waste power station burning on average 585,000tonnes of waste per annum over a 30-year period generating electricity was proposed in London, sited by the Thames to facilitate delivery of waste using the river. It was anticipated that 85% of the waste would be delivered by barge, wi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The construction of a new energy from waste power station burning on average 585,000tonnes of waste per annum over a 30-year period generating electricity was proposed in London, sited by the Thames to facilitate delivery of waste using the river. It was anticipated that 85% of the waste would be delivered by barge, wi
问题补充:

  • 匿名
2013-05-23 12:21:38
从垃圾电站焚烧平均超过30年期间产生的电力浪费每年585,000吨的新能源建设,提出了在伦敦泰晤士河选址,方便河废物交付。有人预计,85%的废弃物将道路交付余下的废物,由驳船交付。从这个过程中的残留将通过驳船和公路也将被删除。这将导致额外的55328每年的公路旅行。
  • 匿名
2013-05-23 12:23:18
建设一个新的能源浪费电站刻录平均每年有585000名公吨的废物在30年期间发电,是在伦敦,泰晤士河,以便安放的交付使用的废物的河。 这是预期的,85%的废物会提供通过驳船,其余废水通过公路运到。 从残留物的过程也将被删除,插入和道路。 这会导致一个额外55,328道每年知识产权方面。
  • 匿名
2013-05-23 12:24:58
新的能量的建筑从烧在废物平均585,000tonnes的废发电站%E
  • 匿名
2013-05-23 12:26:38
新能源从燃烧的废物电站的建设平均 585,每年在 30 年内发电提议在伦敦,废物 000tonnes 座落在泰晤士河畔,促进提供废物利用河流。预计 85%的废物会交付驳,剩余的废物所提供的道路。从进程的残留也将拆除驳船和道路。这将导致每年额外的 55,328 路旅行。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭