当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:  而对于安全保护机构,首先提出整个机构的总体设计方案;其次对弹簧、滚轮、脱离机构、重锤进行设计计算及斜面和导轨所受滚轮的挤压进行受力分析;然后估算其初取值,再进行校核,最后确定实际值。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
  而对于安全保护机构,首先提出整个机构的总体设计方案;其次对弹簧、滚轮、脱离机构、重锤进行设计计算及斜面和导轨所受滚轮的挤压进行受力分析;然后估算其初取值,再进行校核,最后确定实际值。
问题补充:

  • 匿名
2013-05-23 12:21:38
For security institutions, first proposed the overall design of the entire organization; followed by spring, the wheel from the body, a heavy hammer design calculations and Bevel and rail wheel suffered extrusion force analysis; and then estimate its early take value, and then check, and finally det
  • 匿名
2013-05-23 12:23:18
For safety, the first agency for the protection of the entire body; the overall design of the spring, followed by rollers, heavy hammer away from institutions, design computing and ramps and rails of the rollers squeeze the force analysis; and then assess their in
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭