当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:e) 采用过桥或塞块的数量视焊口直径和壁厚而定,一般为四块,特殊位置或特殊结构可增加或减少过桥或塞块的数量。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
e) 采用过桥或塞块的数量视焊口直径和壁厚而定,一般为四块,特殊位置或特殊结构可增加或减少过桥或塞块的数量。
问题补充:

  • 匿名
2013-05-23 12:21:38
e) use of the bridge or chock number depends on the weld diameter and wall thickness, typically four, a special location or special structure to increase or decrease the number of bridge or chock.
  • 匿名
2013-05-23 12:23:18
E) * with feeder or block depending on the number port weld diameter and wall thickness and is generally a 4 block, the special position or special structures to increase or decrease the feeder or block number.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
E) bridge or the number of blocks as the crater diameter, and wall thickness may be, usually four, special locations or special structures can be increased or decreased across the bridge or the number of blocks.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭