求翻译:基层处理,找标高、弹线,洒水,抹灰饼和标筋 ,搅拌砂浆,刷水泥浆结合层 ,铺水泥砂浆面层,木抹子搓平,铁抹子压第一遍,第二遍压光,第三遍压光,养护是什么意思?

待解决 悬赏分:1 - 离问题结束还有
基层处理,找标高、弹线,洒水,抹灰饼和标筋 ,搅拌砂浆,刷水泥浆结合层 ,铺水泥砂浆面层,木抹子搓平,铁抹子压第一遍,第二遍压光,第三遍压光,养护
问题补充:

  • 匿名
2013-05-23 12:21:38
Primary treatment, to find the elevation, the elastic line, the sprinkler, plastering, cakes and standard tendons, mixing mortar, brush the grout bond layer, laying the surface layer of cement mortar, wood trowel to rub flat iron trowel pressure to pass, a second pressure light, the third time, cale
  • 匿名
2013-05-23 12:23:18
With grass-roots level, elevation, and pop-up sprinklers, and plastered a pie and the rib, mortar mix, brush with water mud layer, top with cement mortar, wood putty sub-pick Kowloon-Canton Railway Mary Magdalene, the first pass the pressure, the pressure, and 2 times 3 times, and the conservation
  • 匿名
2013-05-23 12:24:58
The subsealing, looks for the elevation, the ball line, the water spray, the plastering cake and the sign muscle, the agitation mortar, the boshing mud close binder, spreads the cement mortar surface layer, the wooden trowel rubs the hands evenly, the hard trowel presses first, second the rolling, t
  • 匿名
2013-05-23 12:26:38
Primary treatment, elevation, elastic cord, sprinkler, plastering the pie and bar, mixing mortar, brush with layers of cement slurry, cement mortar pavement, wood rubbed plain, iron-first, second, third, and conservation
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 