求翻译:The recalculation of setpoints is performed each hour of the day in a 24-hour sliding planning horizon and uses updated current conditions to initiate calculations. Current conditions, at hour k, include information such as peak demand to date for the month and ice tank state of charge. For each hour into the planning 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The recalculation of setpoints is performed each hour of the day in a 24-hour sliding planning horizon and uses updated current conditions to initiate calculations. Current conditions, at hour k, include information such as peak demand to date for the month and ice tank state of charge. For each hour into the planning
问题补充:

  • 匿名
2013-05-23 12:21:38
重新计算设定点进行24小时的滑动规划地平线一天每个小时,使用更新目前的状况,开始计算。当前小时ķ条件,包括需求高峰月份和负责冰槽状态日期等信息。每个纳入规划地平线小时,每小时AMBI-ENT温度和预期的建筑物负荷,如控制变量的估计。冷水机组设定温度和主回路三通阀的初始设置为-1°C和50%,分别为。它通过实验发现,控制器融合的解决方案更快,如果使用这些初始值。
  • 匿名
2013-05-23 12:23:18
执行重新计算的设定点是每一天中的小时在一个24小时滑动计划范围和使用更新的当前条件,启动计算。 目前条件下,在小时k、包括信息,例如峰值需求到目前为止的月和冰箱充电状态。 对于每个小时到规划的期限,不受控制地变量,如每小时就是患——企业预计建筑负载温度和估计。
  • 匿名
2013-05-23 12:24:58
setpoints的重估在24小时滑的计划展望期执行天的毎小时并且使用更新当前情况创始演算。 当前条件,在小时k,迄今包括信息例如最高需求对月并且冰充电坦克状态。 在毎小时到计划展望期里,未管制的可变物例如每小时ambi- ent温度和被期望的修造的装载估计。 更加寒冷的setpoint温度和主要圈三通的阀门最初被设置对- 1°C和50%,分别。 它通过实验被发现了控制器快速地聚合了对解答,如果使用了这些原始价值。
  • 匿名
2013-05-23 12:26:38
重新设定计算并执行每个小时,一天 24 小时的滑动规划视野中的启动计算使用更新当前的条件。目前条件下的,在小时 k,包括诸如电荷的月和冰坦克状态日期的峰值需求信息。规划年期到每个小时,不受控制的变量,如每小时围耳鼻喉温度和预期的建筑负荷估计。冷水机组设定温度和主回路三用阀最初设置为 – 1 ° C 和 50%,分别。这是通过控制器汇集到一个解决方案更快如果这些初始数值用的实验。