当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Design, Manufacture, inspection, testing, delivery to site, installation, testing & commissioning, performance test and related civil works and building works including necessary auxiliaries and ancillaries on Turnkey basis for Bangladesh Power Development Board (BPDB). The project includes one (1) gas turbine generati是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Design, Manufacture, inspection, testing, delivery to site, installation, testing & commissioning, performance test and related civil works and building works including necessary auxiliaries and ancillaries on Turnkey basis for Bangladesh Power Development Board (BPDB). The project includes one (1) gas turbine generati
问题补充:

  • 匿名
2013-05-23 12:21:38
设计,制造,检验,测试,交付到现场,安装,测试和调试,性能测试及相关土建工程建设工程,包括必要的辅助设备和辅助设备交钥匙孟加拉国电力发展局(bpdb)的基础上。该项目包括一(1)燃气涡轮机组及辅助设备。植物配置一个西门子模型,SGT5-pac2000e燃气轮机机组。燃气涡轮机模型是SGT5-2000E(v94.2前,这是重型,单一轴,轴向排气。发电机模型是sgen5-1000A,风冷式现场输出148mw净设计。条件和使用天然气作为燃料。燃气涡轮发电机冰雹配有全天候的住房和双梁桥式起重机电气起重机,而大厅的两侧是笔。助剂,包括天然气供应站,压缩空
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭