当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:九江市水利电力规划设计院承担了赤湖泵站新建工程初步设计的任务。在收集基础资料的基础上,提出本设计报告。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
九江市水利电力规划设计院承担了赤湖泵站新建工程初步设计的任务。在收集基础资料的基础上,提出本设计报告。
问题补充:

  • 匿名
2013-05-23 12:21:38
Jiujiang City Water Resources and Electric Power Planning and Design Institute has undertaken the task of the preliminary design of the new construction of Red Lake Pumping Station. To collect basic data on the basis of the design report.
  • 匿名
2013-05-23 12:23:18
9 city water conservancy and electric power planning and design institute (Bear Lake pump station has new preliminary design. Based on information collected on the basis of the design report.
  • 匿名
2013-05-23 12:24:58
Jiujiang City Water conservation Electric power Plan Design institute has undertaken the red lake pumping station new construction preliminary design duty.In the collection basic data foundation, proposes this design report.
  • 匿名
2013-05-23 12:26:38
Jiujiang city water conservancy and electric power Design Institute has undertaken preliminary design of chihu new pumping station engineering tasks. In the collection of basic data on the basis of, this design report.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭