当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:19.7 Near end ground bus bar shall be installed at the point where the antenna transmission liners enters the shelter(or building ),and shall be connected to the external ground ring using the straightest possible downward run of 35 mm2 csa (#2 AWG)or larger bare solid or stranded tinned Copper conductor,it should be l是什么意思?

待解决 悬赏分:1 - 离问题结束还有
19.7 Near end ground bus bar shall be installed at the point where the antenna transmission liners enters the shelter(or building ),and shall be connected to the external ground ring using the straightest possible downward run of 35 mm2 csa (#2 AWG)or larger bare solid or stranded tinned Copper conductor,it should be l
问题补充:

  • 匿名
2013-05-23 12:21:38
19.7近端接地母线应安装在天线传输内衬进入住房(或建筑物),并应连接到外部接地环使用直可能向下运行的35 mm2的CSA(2#AWG)或较大的裸实心或绞合镀锡铜导体,应该大到足以容纳所有coacial的连接,并连接到接地电极系统。
  • 匿名
2013-05-23 12:23:18
19.7在接近地面巴士大律师须装设在那里天线传送进入强硬派的住房(或建设),并须连接至外部地面环straightest可能使用的运行的下调35mm2修正案(#2AWG)或更大裸固体或边镀锡铜导体,应足以容纳所有coacial连接和连接停飞电极系统。
  • 匿名
2013-05-23 12:24:58
19.7在末端附近地面母线将安装在点,天线传输划线员进入风雨棚(或大厦)和连接到外在地面圆环使用35 mm2 csa (#2最平直的可能的向下奔跑AWG)或更大的光秃的坚实或搁浅的罐子铜指挥,它应该是足够大容纳与地面电极系统的所有coacial连接和连接。
  • 匿名
2013-05-23 12:26:38
19.7 近结束地面母线应安装在哪里天线传输班轮公司进入 shelter(or building),及须连接使用的笔直可能向下运行 35 mm2 csa 的外部地面环 (# 2 AWG) 或大裸固体或搁浅镀锡铜导体,它应该是大得足以容纳所有 coacial 连接和接地电极系统的连接。
  • 匿名
2013-05-23 12:28:18
19.7 近结束地面母线应安装在哪里天线传输班轮公司进入 shelter(or building),及须连接使用的笔直可能向下运行 35 mm2 csa 的外部地面环 (# 2 AWG) 或大裸固体或搁浅镀锡铜导体,它应该是大得足以容纳所有 coacial 连接和接地电极系统的连接。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭