求翻译:装置运行了仅8个月时间就出现了填料污泥堆积、生物膜功能退化、处理设施损坏、出水水质不能稳定达到电厂冷却回用水标准等问题。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
装置运行了仅8个月时间就出现了填料污泥堆积、生物膜功能退化、处理设施损坏、出水水质不能稳定达到电厂冷却回用水标准等问题。
问题补充:

  • 匿名
2013-05-23 12:21:38
The device runs only eight months on the filler sludge accumulation, degradation of the biofilm functions to deal with damaged facilities, water quality can not be stable up to the power plant cooling back to the water standard.
  • 匿名
2013-05-23 12:23:18
The unit is only 8 months time to fill the sludge buildup, Biological Membranes feature degradation, damage to the facility, the water does not reach back to the power plant cooling water.
  • 匿名
2013-05-23 12:24:58
The installment moved the only 8 month time to appear the padding sludge stack, the biomembrane function degenerated, processes the facility damage, the water leakage water quality cannot achieve the power plant cooling sales commission water gauge stably and so on the questions.
  • 匿名
2013-05-23 12:26:38
Unit ran for only 8 months showed up packed sludge buildup, biofilm function damage, water quality degradation, treatment facilities cannot be stable to the cooling water in power plant standards and other issues.