|
关注:1
2013-05-23 12:21
求翻译:针对于PL地坪防止下沉,正在督促施工方洒水,沉实后方可进行下道工序施工。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
针对于PL地坪防止下沉,正在督促施工方洒水,沉实后方可进行下道工序施工。
问题补充: |
|
2013-05-23 12:21:38
For pl floor to prevent sinking, is to supervise the construction side sprinkler, be pragmatic and process construction.
|
|
2013-05-23 12:23:18
In response to ping to prevent sinking PL is urging construction party, sprinkler, and real-time before you can proceed to the next road construction operations.
|
|
2013-05-23 12:24:58
In view of prevents the submersion in the PL grounds around a house, is supervising the construction side water spray, after sinks the reality only then to carry on the evil ways working procedure construction.
|
|
2013-05-23 12:26:38
For PL flooring to prevent sinking, is urging the construction of watering, setting until the next procedure construction.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区