当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:National Cooperative Highway Research Program (NCHRP) Synthesis 376, Quality Assurance in Design-Build Projects, states “With the changing quality roles found in the DB delivery method, it is imperative that quality responsibilities and the responsible parties are clearly stated in the contract documents.” (3)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
National Cooperative Highway Research Program (NCHRP) Synthesis 376, Quality Assurance in Design-Build Projects, states “With the changing quality roles found in the DB delivery method, it is imperative that quality responsibilities and the responsible parties are clearly stated in the contract documents.” (3)
问题补充:

  • 匿名
2013-05-23 12:21:38
国家合作公路研究计划(NCHRP)的合成376,在保证设计质量的建设项目,国家不断变化的质量DB交付方法中的角色“,它是重要的质量责任和责任方在合同文件中明确指出“(3)
  • 匿名
2013-05-23 12:23:18
全国合作社公路研究计划(nchrp)综合376,以设计建造及营运方式的质量保证项目,国家“找到的角色变化的质量在“db交付方法,必须对此负有责任的各方质量责任,并在合同中明确列出文档)”。(3)
  • 匿名
2013-05-23 12:24:58
全国合作高速公路研究方案(NCHRP)综合376,质量管理在设计修造项目,状态“以被发现的改变的质量角色在DB交付方法,它是必要的质量责任和负责任的党在合同文件清楚地陈述”。 (3)
  • 匿名
2013-05-23 12:26:38
国家合作公路研究程序 (协作) 合成 376,质量保证的设计建造项目、 国家"不断变化的质量角色在 DB 传递方法中找到,就必须合同文件中清楚说明的质量责任和责任方。"() 3
  • 匿名
2013-05-23 12:28:18
国家合作的高速公路调查程序 (NCHRP) 综合在设计中 376,高级保证-建造项目,陈述“以在 DB 发送方法中被找到的改变高级作用,它是强制的那种质量责任和负责的聚会清楚地在合同文件中被陈述。”(3)
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭