当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Different to the urban mass transit station which only has some directions’ trains, the large-scale hub of railway passenger station has many different train numbers. So the passenger flow of every train number couldn’t be built manually. The passenger generation system could generate the simulation passenger based on 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Different to the urban mass transit station which only has some directions’ trains, the large-scale hub of railway passenger station has many different train numbers. So the passenger flow of every train number couldn’t be built manually. The passenger generation system could generate the simulation passenger based on
问题补充:

  • 匿名
2013-05-23 12:21:38
不同的城市轨道交通站,其中只有一些方向的列车,大型铁路客站枢纽,有许多不同的车次。所以每车次客流不能手动建立。客运发电系统可以生成基于到达时间分布的列车运行时间表和满负荷比模拟乘客。
  • 匿名
2013-05-23 12:23:18
不同的城市,只有一些地下站方向的列车,在这大规模的铁路客运枢纽站车次有很多不同。 因此,乘客流量的每个列车无法内置手动。 乘客一代系统可以生成模拟乘客根据到达时间分布列车运行时间表和满负荷率。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
不同的城市轨道交通车站于只有一些方向的列车,大型枢纽的铁路旅客车站有许多不同的火车数字。于是不能手动建立每车次的旅客流量。系统无法生成基于到达时间分布的模拟旅客的客运代培训操作时间表和满负荷比率。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭