当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The deliverables selected in consultation with the Supplier are scheduled according to the project schedule, at the end of the Setup Review or in the following month. The reference Q3P chart is a validated frame that must be respected; in particular, the section headings (in blue or red) are mandatory along with the 6 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The deliverables selected in consultation with the Supplier are scheduled according to the project schedule, at the end of the Setup Review or in the following month. The reference Q3P chart is a validated frame that must be respected; in particular, the section headings (in blue or red) are mandatory along with the 6
问题补充:

  • 匿名
2013-05-23 12:21:38
在与供应商协商选定的交付计划根据项目进度,在设置审查结束,或在接下来的一个月。参考q3p图是经过验证的框架必须得到尊重;,特别是部分标题(蓝色或红色)代表强制性的最后期限(深蓝色)6列的强制性
  • 匿名
2013-05-23 12:23:18
协商选定的可交付物的供应商计划根据项目安排,在最终的设置,请查看或在其后一个月。 参考q3p图是一个验证帧的问题必须得到尊重;特别是,该部分的标题(在蓝色或红色)是强制性的6列代表以及强制性的期限内(深蓝色)
  • 匿名
2013-05-23 12:24:58
在咨询选择的deliverables与供应商预定根据项目日程表,在设定回顾的结尾或在以下月。 参考Q3P图是必须尊敬的一个被确认的框架; 特别是,部分标题(在蓝色或红色)与代表必须的最后期限的6个专栏一起是必须的(在深蓝)
  • 匿名
2013-05-23 12:26:38
与供应商协商中所选的可交付结果是根据项目日程,结束安装程序审查的或在下一个月时计划的。引用 Q3P 图表是经过验证的框架中必须得到尊重 ;(在蓝色或红色) 的章节标题,尤其是随着代表 (深蓝色) 中的强制性最后期限的 6 列强制性
  • 匿名
2013-05-23 12:28:18
可交付
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭