当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:However, postponing the expansion decision increases the risk of capacity shortage when shipping demand is expected to grow (Ryan, 2004). Such issues of service capacity management have been widely reported in the SCM and operations management literature. For instance, Nickell (1977) establishes a model with uncertain 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
However, postponing the expansion decision increases the risk of capacity shortage when shipping demand is expected to grow (Ryan, 2004). Such issues of service capacity management have been widely reported in the SCM and operations management literature. For instance, Nickell (1977) establishes a model with uncertain
问题补充:

  • 匿名
2013-05-23 12:21:38
然而,决定推迟扩充航运需求预计将增长(瑞安,2004年)时,增加了容量不足的风险。服务容量管理等问题,已被广泛报道的供应链管理和运营管理文学。举例来说,尼克尔(1977)建立与航运需求的未来变化的不确定性时序模型。
  • 匿名
2013-05-23 12:23:18
但是,延迟扩展决定却增加了风险的能力不足,航运需求预计增长(瑞安,2004)。 服务能力管理等问题做了广泛报道和业务管理scm文学。 例如,nickell(1977)建立了一个模型,不确定未来的改变,航运需求的时间。
  • 匿名
2013-05-23 12:24:58
然而,延期扩展决定增加容量短缺的风险,当运输的需求预计增长时(赖安2004年)。 服务能力管理的这样问题在SCM和操作管理文学广泛报告了。 例如, Nickell (1977年)建立一个模型以未来变化不定的时间在运输需求上的。
  • 匿名
2013-05-23 12:26:38
但是,推迟扩张决定增加容量不足的风险时航运需求预计将增长 (Ryan,2004年)。这样的服务能力管理问题有广泛报道在供应链管理和操作管理文献中。例如,是好例子 (1977 年) 航运需求中建立了一个模型与不确定的未来变化的计时。
  • 匿名
2013-05-23 12:28:18
然而,延迟扩展决定增强发出需求时
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭