当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:踏勘小组一行在5月11日早晨ADDIS ABABA出发,到16号下午6点安全返回营地,共历时6天,基本完成了预定的踏勘目标,踏勘细节描述如下:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
踏勘小组一行在5月11日早晨ADDIS ABABA出发,到16号下午6点安全返回营地,共历时6天,基本完成了预定的踏勘目标,踏勘细节描述如下:
问题补充:

  • 匿名
2013-05-23 12:21:38
The reconnaissance team starting line the morning of May 11 addis ababa the safe return of the camp at 18 o'clock on the 16th, which lasted for six days, basically completed the scheduled reconnaissance objectives, reconnaissance detail as follows:
  • 匿名
2013-05-23 12:23:18
The exploration group on 11 may, and early morning departure to ADDIS ABABA 16 th, at 6 o'clock, safe return to the camp, which lasted 6 days completed the basic reconnaissance exploration target, detailed description as follows:
  • 匿名
2013-05-23 12:24:58
Inspects a group line morning ADDIS ABABA to embark in May 11, to 16 afternoon 6 o'clock return safe and sound battalions, altogether lasts 6 day, completed basically predetermined inspected the goal, inspected the detail description to be as follows:
  • 匿名
2013-05-23 12:26:38
Reconnaissance group in ADDIS ABABA on May 11 morning departure, to the safe return of 6 o'clock in the afternoon, 16th camp, after 6 days in total, almost completed a reconnaissance of the intended target, reconnaissance details are described below:
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭