当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:南岸滩涂长,施工条件复杂,采用常规设计方案和施工方法很难满足工期要求是什么意思?

待解决 悬赏分:1 - 离问题结束还有
南岸滩涂长,施工条件复杂,采用常规设计方案和施工方法很难满足工期要求
问题补充:

  • 匿名
2013-05-23 12:21:38
The south bank of shoals, and the complexity of the construction conditions, the use of conventional design and construction methods is difficult to meet the schedule requirements
  • 匿名
2013-05-23 12:23:18
South Shore shoals long, complex construction conditions, with a conventional design and construction methods is very difficult to meet deadlines
  • 匿名
2013-05-23 12:24:58
The Nanan shallow seas and tidelands is long, the construction condition is complex, uses the convention design proposal and the job practice is very difficult to satisfy the time limit for a project request
  • 匿名
2013-05-23 12:26:38
South shore beach long, complicated construction conditions, General design and construction methods to meet time requirements
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭