当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Although a planning horizon of only 15 to 18 hours is sufficient to realize almost all of the cost savings of optimal control, this study used a planning horizon of 24 hours due to the cyclic nature of TES operation. The traditional cost function has two parts: the cost of electri- cal energy [kWh] consumed over the bi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Although a planning horizon of only 15 to 18 hours is sufficient to realize almost all of the cost savings of optimal control, this study used a planning horizon of 24 hours due to the cyclic nature of TES operation. The traditional cost function has two parts: the cost of electri- cal energy [kWh] consumed over the bi
问题补充:

  • 匿名
2013-05-23 12:21:38
虽然只有15至18小时的规划范围是足够的,几乎全部实现最优控制的成本节约,本研究采用了24小时由于TES操作循环性质的规划范围。传统的成本函数有两部分:电气能源千瓦时]在计费周期和成本消耗高峰期的电力需求千瓦的成本。棘轮没有被用来在这项研究中,可与其他工作相比,这样的结果。使用两个不同的利率周期
  • 匿名
2013-05-23 12:23:18
虽然计划范围的只有15至18小时,足以实现几乎所有的成本节约的最优控制,这项研究使用了一个24小时的规划期的周期性特点由于工商业污水附加费。 在传统的成本函数有两个部分:成本的电绳-cal(校准)能源消费[千瓦时]记帐时段和高峰期电力需求的成本[kw]。 一个棘齿不使用可以比较得出结果,研究与其他工作。 使用两个不同时期率
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
虽然只有 15 到 18 小时的规划年期足以实现几乎所有的最优控制的成本节约,这项研究使用 24 小时循环的工商业污水附加费操作性质的规划年期。传统成本函数有两个部分: 电炒锅 cal 能源 [千瓦时] 成本消耗超过付费期限和电力需求高峰 [kW] 成本。这样,结果可能会与其他工作比较棘轮是不能使用这项研究。使用两个不同的利率周期
  • 匿名
2013-05-23 12:28:18
虽然仅仅 15 至 18 小时的一条制定计划地平线足以意识到优化的控制的几乎所有节省成本,这项研究使用由于 TES 操作的循环的自然的 24 小时的一条制定计划地平线。传统花去的功能有两部分: electri 的 cal 能量的费用 ( 千瓦时 ) 过来为高峰电需求消耗给人开帐单时期和费用 (kW)。一个棘齿没有用于这项研究,以便结果可以被与其他工作比较。使用二段独特的比率时期
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭