当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1.工期超时风险:即造成局部的(工程活动、分项工程)或整个工程的工期延长,不能及时投入使用。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1.工期超时风险:即造成局部的(工程活动、分项工程)或整个工程的工期延长,不能及时投入使用。
问题补充:

  • 匿名
2013-05-23 12:21:38
A duration of time-out risk: that is caused by the local (project activities, to extend the sub-project) or the duration of the entire project and can not put into use.
  • 匿名
2013-05-23 12:23:18
1.Timeout Period risks, which have local (project activities, a project) or the entire works of the period was extended, in a timely manner.
  • 匿名
2013-05-23 12:24:58
1. time limit for a project overtime risk: Namely creates partial (project activity, sub-item project) or the entire project time limit for a project extension, cannot the prompt operational.
  • 匿名
2013-05-23 12:26:38
1. the timeout duration risk: that is, a partial (project activity, project) or to extend the duration of the project as a whole, cannot be put to use in a timely manner.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭