求翻译:n case of performing Warranty Works in Poland by an ASS the cost of working time shall be returned by the Contractor in the amount of real costs of these works, based on the VAT invoice issued by the ASS, not higher, however, than the amount equal to the Solaris net rate as specified in §6 section 1.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
n case of performing Warranty Works in Poland by an ASS the cost of working time shall be returned by the Contractor in the amount of real costs of these works, based on the VAT invoice issued by the ASS, not higher, however, than the amount equal to the Solaris net rate as specified in §6 section 1.
问题补充:

  • 匿名
2013-05-23 12:21:38
返回n的执行驴工作时间的成本在波兰的保修工程的情况下,应当由承包商在这些工程的实际成本的金额,根据增值税专用发票由屁股,没有更高的发行,然而,比金额等于§6第1节指定的Solaris净率。
  • 匿名
2013-05-23 12:23:18
n案例进行保修的工程在波兰的一个驴子的处理成本的时间是由承包人在工程量的实际费用,根据所发出的增值税发票的驴,而不是更高,金额等于净率为solaris1节第6条所指明的。
  • 匿名
2013-05-23 12:24:58
实行保证的 n 案例用一个屁眼在波兰工作操纵时间的费用将被承包商归还这些工作的数量的实际费用中的 ,根据被蠢驴发行的大桶发票,不更高,然而,比数量与 Solaris 网比率同等如指定在?6 将 1 分组。
  • 匿名
2013-05-23 12:26:38
n 案例在波兰的驴中执行保修工程的实际开支的这些作品,基于发出的屁股,然而,比数额,相等于作为指定的 §6 第 1 节的 Solaris 净率不高的增值税专用发票的金额承建商的须交还工作时间的成本。