当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施工中停水,电8小时或累计停水、电8小时,按一天计算顺延。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工中停水,电8小时或累计停水、电8小时,按一天计算顺延。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction of water supply and electricity 8 hours or accumulated without water, electricity eight hours by one day be postponed.
  • 匿名
2013-05-23 12:23:18
Construction stopped in water, electricity or the cumulative 8 hours stop water, electricity, and 8 hours to a day.
  • 匿名
2013-05-23 12:24:58
In the construction cuts off the water supply, the electricity 8 hour or the accumulation cuts off the water supply, the electricity for 8 hours, postpones according to a day computation.
  • 匿名
2013-05-23 12:26:38
In the construction of suspension, 8 hours or periods without water and electricity for 8 hours, calculated on a day extended.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭