当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Step 3: Push the connector onto the PWB. With the connector aligned as described in step 2, gently push the connector until the two rows of SMT leads on the connector slide up and over the edge of the PWB. If the edge of the PWB is not beveled as described in paragraph 4.3 above, it will be very difficult to slide the 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Step 3: Push the connector onto the PWB. With the connector aligned as described in step 2, gently push the connector until the two rows of SMT leads on the connector slide up and over the edge of the PWB. If the edge of the PWB is not beveled as described in paragraph 4.3 above, it will be very difficult to slide the
问题补充:

  • 匿名
2013-05-23 12:21:38
第3步:推到PWB的连接。对齐步骤2中所述的连接器,轻轻一推,直到两个连接器上的幻灯片行的SMT引线连接器,并在工作计划和预算的边缘。如果不斜面在上文第4.3段所述的工作计划和预算的边缘,这将是非常困难的工作计划和预算的边缘滑入接头。
  • 匿名
2013-05-23 12:23:18
步骤3:将连接器安装到pwb中 与连接器对齐,如第2步所述,轻轻的推入连接器,直至两个行上的导联的smt连接器滑入,直至超过边缘的pwb中 如果边缘的pwb的不带斜边如中所述第4.3段所述,将很难使幻灯片上的连接器的边缘的pwb中
  • 匿名
2013-05-23 12:24:58
第3步: 推挤连接器PWB。 当连接器被排列如所描述在第2步,柔和地推挤连接器,直到SMT主角二列在连接器滑和在PWB的边缘。 如果PWB的边缘在段4.3没有成斜面如所描述上面,滑连接器PWB的边缘将是非常难的。
  • 匿名
2013-05-23 12:26:38
第 3 步: 将推到印制板上的连接器。与连接器对齐第 2 步中所述,轻轻推入连接器直到 SMT 中的两行导致了与印制板的边缘上的连接器幻灯片上。如果上文第 43 段中所述,不斜面边缘的印制板,它将很难滑到边缘的印制板上的连接器。
  • 匿名
2013-05-23 12:28:18
%
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭