当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:the accumulation,compiling and approval for the completion Materials should synchronize with the Construction process And the whole set of qualified completion drawing acceptance Should synchronize with the construction acceptance in light Of the Archives Law and the State Archive Bureau’s report on Printing distributi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
the accumulation,compiling and approval for the completion Materials should synchronize with the Construction process And the whole set of qualified completion drawing acceptance Should synchronize with the construction acceptance in light Of the Archives Law and the State Archive Bureau’s report on Printing distributi
问题补充:

  • 匿名
2013-05-23 12:21:38
积累,编制和审批,完成材料应同步在施工过程中和整套合格的竣工图纸验收应同步的施工验收的档案法律和散发的验收方式,打印的状态存档局的报告,建筑(工程)档案。
  • 匿名
2013-05-23 12:23:18
accumulation,compiling的审批,完成材料的建设应同步的一整套的流程和合格完成绘图的接受应该同步建设验收的档案在灯的国家档案资料的法律和关于打印的报告局接受的方式分发的建设(工程)archives.
  • 匿名
2013-05-23 12:24:58
聚积,编辑和完成材料的审批应该同步以建造过程和整个有资格一套的完成素描接受应该同步随着建造接受根据存档法律和有关分散 Construction(Engineering) 存档的接受方法的印刷的州存档局的报告。
  • 匿名
2013-05-23 12:26:38
accumulation,compiling 和完成审批材料应与施工进程同步和绘图验收合格完成整套应根据档案法 》 和国家存档局报告配送的建筑 (工程) Archives. 验收方法的印刷工程验收与同步
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭