求翻译:当关键路线上某些工作时间缩短了或非关键路线上的活动时间后延了,则有可能出现关键路线的转移,系统需重新计算新的关键路线和时间参数。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当关键路线上某些工作时间缩短了或非关键路线上的活动时间后延了,则有可能出现关键路线的转移,系统需重新计算新的关键路线和时间参数。
问题补充:

  • 匿名
2013-05-23 12:21:38
After some time in the critical path or non-critical path activity on the time extension, there may occur a transfer of the critical path, the system must re-calculate the new critical path and time parameters.
  • 匿名
2013-05-23 12:23:18
Some of the key routes when the time was reduced or non-critical path activities on time after time, it may be possible to transfer the key route system will need to re-calculate a new critical path and time parameters.
  • 匿名
2013-05-23 12:24:58
After in the critical path certain operating time reduced or in the non-critical path active time extended, then has the possibility to appear the critical path the shift, the system must the recomputation new critical path and the time parameter.
  • 匿名
2013-05-23 12:26:38
When some work time on the critical path or extension of time on a non-critical path activities, are likely to be key route transfer, the system needs to recalculate the new critical path and time parameters.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 