当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:经整型后围堰戗体高程已填至451.5m,顶宽5.0m,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
经整型后围堰戗体高程已填至451.5m,顶宽5.0m,
问题补充:

  • 匿名
2013-05-23 12:21:38
Cofferdam the berm body height by integer filled to 451.5m, top width of 5.0m.
  • 匿名
2013-05-23 12:23:18
The integer of cofferdam false trade descriptions after the elevation has been filled to 451.5 M, and the top 5.0 m wide.
  • 匿名
2013-05-23 12:24:58
The coffer dam body elevation has filled in an opposite direction after the trueing to 451.5m, goes against extends 5.0m,
  • 匿名
2013-05-23 12:26:38
Cofferdam of conflict after the integer height is filled to 451.5M, w 5.0M,
  • 匿名
2013-05-23 12:28:18
after the whole-body false trade descriptions of cofferdam elevation has been filled to 451.5 m, Width 5.0 M, top;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭