当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:运用上文所述的评估方法进行广州电网2010夏大运行方式和冬小运行方式风险评估。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
运用上文所述的评估方法进行广州电网2010夏大运行方式和冬小运行方式风险评估。
问题补充:

  • 匿名
2013-05-23 12:21:38
The assessment methods described above, the Guangzhou power operation mode of the summer and winter operation mode risk assessment.
  • 匿名
2013-05-23 12:23:18
As described above using the evaluation method for Guangzhou grid how to run the 2010 summer and winter running Risk assessment methods.
  • 匿名
2013-05-23 12:24:58
The appraisal method states which using the preceding text carries on the Guangzhou electrical network 2010 summer big movement way and the winter small movement way risk assessment.
  • 匿名
2013-05-23 12:26:38
Using the above mentioned assessment methods in Guangzhou power grid 2010 runs summer and winter and small run as risk assessment.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭