当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:申报项目分解结构是根据项目的特点、要求、项目各阶段任务的分工、项目进度控制的需要等情况进行综合考虑,进行具体的项目工作结构分解,将整个项目分解成一系列相互关联的基本活动。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
申报项目分解结构是根据项目的特点、要求、项目各阶段任务的分工、项目进度控制的需要等情况进行综合考虑,进行具体的项目工作结构分解,将整个项目分解成一系列相互关联的基本活动。
问题补充:

  • 匿名
2013-05-23 12:21:38
The declaration of the project breakdown structure is based on the characteristics of the project, requirements, need for control of the division of all stages of the project tasks, project schedule, etc. into account, specific project work breakdown structure, the entire project into a series of in
  • 匿名
2013-05-23 12:23:18
Reporting project breakdown structure is based on the item's characteristics, requirements, and the various stages of the project, the Division of the progress of the project control, need to be integrated, project-specific work structures break down, and the entire project broken down into a series
  • 匿名
2013-05-23 12:24:58
Reported the project decomposition structure is according to the project characteristic, the request, the project various stages duty division of labor, project progress control situations and so on need carries on the overall evaluation, carries on the concrete project work structure to decompose,
  • 匿名
2013-05-23 12:26:38
Declaration of project breakdown structure is based on the characteristics of the project, requirements, Division of each stage of the project, progress control to balance the needs of the project, specific project work breakdown structures, the entire project into a series of interrelated activitie
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭