当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:综合考虑和分析与公路隧道照明密切相关的时间、天气、路段、环境照度和交通流量等因素是什么意思?

待解决 悬赏分:1 - 离问题结束还有
综合考虑和分析与公路隧道照明密切相关的时间、天气、路段、环境照度和交通流量等因素
问题补充:

  • 匿名
2013-05-23 12:21:38
Closely related to time, weather, road, environment illumination, and traffic and other factors to consider and analyze highway tunnel lighting
  • 匿名
2013-05-23 12:23:18
Comprehensive consideration and analysis and the road tunnel lighting, and weather conditions closely related to the time, the environment, and road traffic light and other factors
  • 匿名
2013-05-23 12:24:58
Overall evaluation and analysis and highway tunnel illumination close factors and so on correlation time, weather, road section, environment degree of illumination and traffic flow
  • 匿名
2013-05-23 12:26:38
Consideration and analysis of highway tunnel lighting is closely related to the time, weather, roads, environment illumination and traffic flow and other factors
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭