当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对于其之后有多条活动的节点,最迟时间如下式所示:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对于其之后有多条活动的节点,最迟时间如下式所示:
问题补充:

  • 匿名
2013-05-23 12:21:38
Followed by a number of the node, no later than the time shown as follows:
  • 匿名
2013-05-23 12:23:18
After the there is more than one active node, not later than the time shown in the following:
  • 匿名
2013-05-23 12:24:58
After its has the multi-strip activity node, latest time following -like shows:
  • 匿名
2013-05-23 12:26:38
After it has multiple active nodes, no later than the time shown in the following:
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭