当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:According to the site visits, in the phase of processing surface, there is no construction path in pass-by tunnels, pools and final 2km sections, and some parts of surface hasn’t been cleaned or backfilled with sand, which will bring great diffculities to subgrade contruction.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to the site visits, in the phase of processing surface, there is no construction path in pass-by tunnels, pools and final 2km sections, and some parts of surface hasn’t been cleaned or backfilled with sand, which will bring great diffculities to subgrade contruction.
问题补充:

  • 匿名
2013-05-23 12:21:38
根据实地考察,在加工表面的阶段,有没有建设路径中通隧道,游泳池和最后的2公里部分,和一些零件表面没有被清理干净,或用沙土回填,这将带来巨大的diffculities路基建设的探索。
  • 匿名
2013-05-23 12:23:18
根据实地访查,在该阶段的加工表面,没有建设路径,通过隧道、池和最后2公里路段,一些零件的表面没有人打扫或撤走了沙,将会带来很大的diffculitiessubgrade,建筑。
  • 匿名
2013-05-23 12:24:58
根据现场采访,在阶段处理表面,没有建筑道路通过由隧道、水池和决赛2km部分,并且表面的有些部分未清洗也未重新填没与沙子,给路基contruction将带来伟大的diffculities。
  • 匿名
2013-05-23 12:26:38
根据实地考察,在阶段的表面处理,有没有建设路径通过隧道、 池和最后的 2 公里的几节,和表面的某些部分还没有清洗或回填砂,将给路基施工带来极大的办学的。
  • 匿名
2013-05-23 12:28:18
根据地点访问,在处理表面的阶段,没有建造路径在经过凿隧道,组合和最后 2 公里部分,表面的部分没有利用沙被清理或覆土于过,将将大的 diffculities 带给子等级 contruction。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭