当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:阎向军, 刘金龙. 利用关键路径法保障油田工程项目进度的新举措[J]. 油气田地面工程, 2010, 29(6): 96-97.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
阎向军, 刘金龙. 利用关键路径法保障油田工程项目进度的新举措[J]. 油气田地面工程, 2010, 29(6): 96-97.
问题补充:

  • 匿名
2013-05-23 12:21:38
Yanxiang Jun, Liu Jinlong using critical path method to protect the new initiatives of the progress of the oil field project [j]. Ground works in oil and gas fields, 2010, 29 (6): 96-97.
  • 匿名
2013-05-23 12:23:18
Have been to the army, Mr LAU Chin-lung using critical path method, protection of the new oil field projects progress initiatives [] J ground engineering, oil and gas fields, 2010, 29 (6): 96-97.
  • 匿名
2013-05-23 12:24:58
Yan Xiangjun, Liu Jinlong. Using essential path-method safeguard oil field engineering project progress new action (J). Oil-gas field ground project, 2010, 29(6): 96-97.
  • 匿名
2013-05-23 12:26:38
Yan Xiangjun, Liu Jinlong. Protect the oil fields by using the critical path method project schedule of new initiatives [j]. Oil and gas field surface engineering, 2010, 29 (6): 96-97.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭