当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:刘士新, 宋健海, 唐加福. 资源受限项目调度中缓冲区的设定方法[J]. 系统工程学报, 2006, 21(4): 381-386.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
刘士新, 宋健海, 唐加福. 资源受限项目调度中缓冲区的设定方法[J]. 系统工程学报, 2006, 21(4): 381-386.
问题补充:

  • 匿名
2013-05-23 12:21:38
Liu Shixin Songjian Hai, Tang Jiafu. Resource-constrained project scheduling, buffer settings [j]. Systems Engineering, 2006, 21 (4): 381-386.
  • 匿名
2013-05-23 12:23:18
New taxi, Liu song, Mr Henry Tang, at the well, resource-constrained project scheduling in the buffer zone set up method [] J engineering journal, 2006, 21 (4): 381-386.
  • 匿名
2013-05-23 12:24:58
Liu Shixin, Song Jian sea, Tang Jiafu. The resources are limited in the project dispatch buffer hypothesis method (J). Systems engineering journal, 2006, 21(4): 381-386.
  • 匿名
2013-05-23 12:26:38
Liu Shixin, Song Jianhai, Tang Jiafu. Buffer setting in resource-constrained project scheduling method [j]. Journal of systems engineering, 2006, 21 (4): 381-386.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭