当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:同时安排好生产部门已经上线的订单需求物料的及时分配领取;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
同时安排好生产部门已经上线的订单需求物料的及时分配领取;
问题补充:

  • 匿名
2013-05-23 12:21:38
Arrangements for the production sector has been on line orders, the timely distribution of materials to receive;
  • 匿名
2013-05-23 12:23:18
While production sector has been arranged on the line of the order of the material needs for timely distribution.
  • 匿名
2013-05-23 12:24:58
Simultaneously arranged the order form demand material prompt assignment which the good production department already made something a matter of political line to receive;
  • 匿名
2013-05-23 12:26:38
Has also arranged the production sector on the line of the order item assigned to receive in a timely manner;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭