当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:安装防淋伞,接钻头, 试螺杆, 组合钻具, 下钻至2500m, 防喷器试压255atm(合格), 防喷演习, 下钻至3310m, 扩眼3310-3315m, 钻进, 早:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
安装防淋伞,接钻头, 试螺杆, 组合钻具, 下钻至2500m, 防喷器试压255atm(合格), 防喷演习, 下钻至3310m, 扩眼3310-3315m, 钻进, 早:
问题补充:

  • 匿名
2013-05-23 12:21:38
Install anti-leaching umbrella, then drill pilot screw, combination drill, drill to 2500m, BOP pressure test 255atm (qualified), BOP drills, reaming drill to 3310m 3310-3315m drilling, early :
  • 匿名
2013-05-23 12:23:18
Install the shower, to drill, screw, the combination test drilling, drill down to 2500M, the anti-pressure injection, 255 ATM (qualified), the anti-boom exercise, drill down to 3310 M, 3310 - 3315 M eyes, boring, early:
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Installation of shower umbrella, drill, try screw, combined drill, down to 2500m, Blowout preventer pressure test 255atm (qualified), Blowout exercise, down to 3310m, the hole 3310-3315m, drilling, early:
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭