当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Fig. 5a shows the tunnel configuration considered in this section. The upper tunnel center is located at 2.5D below the soil surface; the distance between the tunnel axes is equal to 2D (Fig. 5a). Two analyses were carried out. In the first one, the upper tunnel is constructed at first (reference case), while in the se是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Fig. 5a shows the tunnel configuration considered in this section. The upper tunnel center is located at 2.5D below the soil surface; the distance between the tunnel axes is equal to 2D (Fig. 5a). Two analyses were carried out. In the first one, the upper tunnel is constructed at first (reference case), while in the se
问题补充:

  • 匿名
2013-05-23 12:21:38
图5A显示在本节考虑隧道配置。在2.5D以下的土壤表面上隧道中心位于隧道轴之间的距离是相等的二维(图5A)。两种分析方法进行了。在第一个,上层隧道兴建第一(参考件),而在第二次分析,较低的隧道构造(倒置的情况下)。结果是在隧道的建设成就。图5B,C和D说明了土地沉降的建设过程中的影响力,弯矩和推力。它表明,在第一线索上隧道的建设,以更高的沉降和内力相比,由起初较低的隧道施工中获得的。最大沉降(图5b)在第一种情况是比在第二种情况下高出12%左右,而在第一种情况下的弯矩约23%,高于在第二种情况下引起的(图5C) ;
  • 匿名
2013-05-23 12:23:18
图。 5a显示了本节中审议了隧道配置。 上的隧道中心位于2.5d低于土壤表面;%E
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭