当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2nd, the fire linkage control should include the control spraying of water and the water atomization fire fighting system opens, stops, also should demonstrate the fire pump the work and the malfunction and the fluent display, reports to the police the valve, the safety signal valve working mode active status. In addit是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2nd, the fire linkage control should include the control spraying of water and the water atomization fire fighting system opens, stops, also should demonstrate the fire pump the work and the malfunction and the fluent display, reports to the police the valve, the safety signal valve working mode active status. In addit
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
2日,应包括消防联动控制的控制喷药的水和消防系统将会打开“水雾化,停止,还应表现出的消防泵的工作,并且显示故障和流利,向警方报案的阀门,将安全工作模式处于活动状态信号阀。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
2、 消防联动控制应包括控制喷涂的水和水雾化消防系统打开,会停止,也应证明消防泵工作和故障和流利的显示,报告向警方阀、 安全阀信号工作状态。另外,盆地,为水水箱水位还应进行示范显示器 ;为了防止大修信号阀关闭,作者思想应使用带电信号控制信号阀的证明它打开条件。
  • 匿名
2013-05-23 12:28:18
2,火连接控制应该包括水的喷射的控制和水雾化消防系统打开,也停下来应该演示火打气工作和发生故障和流畅的显示,向警察报告阀门,操纵模式的安全信号阀门活动状态。此外,到盆,水箱水位也应该继续显示显示器;要防止彻底改造信号阀门是关闭,作者想应该使用带子电气车辆信号控制信号阀门所作证明它打开条件。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭